Product Details:
|
Product Name: | Cold Lay Asphalt | Open The Traffic: | Fast Open The Traffic |
---|---|---|---|
Usage Time: | Permanent Repair | Working Temperature:: | -25℃ To 50℃, Can Up To 90℃ For Extremely Hot Places |
Storage: | 2 Years | Application: | Asphalt Pavement |
High Light: | 25kg Cold Asphalt Driveway Repair,Cold Asphalt Driveway Repair for pothole,45lb asphalt driveway crack filler |
Cold Lay Asphalt Cold Asphalt Premix Cold Asphalt Driveway Repair Material is superior permanent road maintenance material, uses a high performance polymer formulated to guarantee its good workability, applicable in all weather conditions and can works in water, repair both asphalt and concrete driveway, no tools needed, accept traffic immediately after installation.
Zhongtian potholes repair technology meets the requirements of fast, timely and all-weather. With fast construction speed, easy operation and the advantages of construction in winter and rain and snow.
No. | Performance index | Technical requirements |
1 | Adhesive grade | 5 |
2 | Penetration strength (kg / cm2) | 0.5-4 |
3 | Stability (kN) | ≥3 |
4 | Residual stability (%) | ≥85 |
1. Permanent pothole repair solutions;
2. Suitable for all weather and environment;
3. No mixing, tacking or mechanical compaction required;
4. Installation can be driven on immediately;
5. Green and environment-friendly;
6. Being prone to storage.
7.Good repairing quality.
8.Wide applicability.
9.High material utilization.
Zhongtian Cold Lay Asphalt Cold Asphalt Premix Cold Asphalt Driveway Repair Material is best choice to repair potholes, utility cuts, road edges, water main breaks, also be utilized as permanent asphalt patch, trench reinstatements, man hole adjustments.
1 Pit cleaning
Clean up the gravel residue inside and around the pit to be repaired. No debris such as mud ice cubes can be left in the pit. Water in the pit does not affect the construction.
2 Brush interface agent
Brush the interface agent when necessary. For example: repair of cement pavement, repair of highway.
3 Fill the pit with cold fill
Fill enough pits into the pit (a 1m³ pit requires about 2.2 tons of cold fill) until the filler is about 1.5㎝ above the road surface. After filling, it’s better that the center of the pit is slightly higher than the surrounding road surface and is curved. If the pit depth is> 4㎝, the repair material should be filled and laminated layer by layer.
4 Compaction
After laying evenly, choose appropriate compaction tools and methods for compaction according to the size and depth of the repaired area and the actual environment. Such as car tire compaction, manual compaction, vibrating plate compaction compaction ad road compactor compaction. When repairing high-grade roads, the periphery and corners of the repaired area should be fully compacted. After the pits are compacted, the joints are closed with emulsified asphalt or joint tapes.
5 Open traffic
It can be opened to traffic immediately after compaction.
Zhongtian Cold Lay Asphalt Cold Asphalt Premix Cold Asphalt Driveway Repair Material can be widely used in municipal roads, general roads, highways, parking lots, airport runways, tunnel damage of road asphalt concrete and cement concrete pavement, ruts, municipal road tunneling, repaired pavement, bridge expansion joints, heavy load pavement , repair and maintenance of road traffic and special road.
Beijing Zhongtian Road-Tech Co.,Ltd. is the Board of Directors of China Transportation Association and Transportation Committee of China Technological Market Association, with expert technical R&D team, continuous innovation ability, rich engineering experience and sufficient capacity. Also we participated in designated road material industry standard certificates.
Contact Person: Shakiya
Tel: 86-15032577974
Fax: 0086-010-6789-3003