Product Details:
|
Product Name: | Cold Asphalt Concrete / Cold Asphalt For Driveway | Open The Traffic: | Fast Open The Traffic |
---|---|---|---|
Usage Time: | Permanent Repair | Storage: | 2 Years |
Color: | Black | Material: | Special Modified Asphalt |
High Light: | Patch cold patch driveway repair,cold patch driveway repair modified asphalt,3kn pourable driveway crack filler |
Cold Asphalt Concrete Cold Asphalt for Driveway Asphat Patch Mix Asphalt Patch in A Bag
ZTA-CA Cold Asphalt Concrete Cold Asphalt for Driveway Asphalt Patch Mix Asphalt Patch in A Bag has good workability, avoids the tedious procedures of fire roasting, and improves the construction efficiency.
Using basalt, SAC-10 gradation, better indicators in all aspects, reduce noise, and improve driving comfort. Zhongtian Road Industry's high-performance cold patching material can be constructed in all weather, without cutting the road surface, and the repair speed is fast. It has strong anti-damage and anti-scattering ability and can be used permanently.
ZTA-CA Asphalt Patch and Pothole Filler Cold Applied Asphalt Quick Patch Repair Asphalt Potholes is a high-tech road repairing material that can be used around the clock and is suitable for repairing various types of road surfaces in any weather and environment, such as asphalt concrete roads, cement concrete roads, parking lots, airport runway, etc. It has been widely used in the world for its simple operation, long storage, good repair quality, traffic can be opened immediately after construction, wide use and environmental protection.
No. | Performance index | Technical requirements |
1 | Adhesive grade | 5 |
2 | Penetration strength (kg / cm2) | 0.5-4 |
3 | Stability (kN) | ≥3 |
4 | Residual stability (%) | ≥85 |
1 Pit cleaning
Clean up the gravel residue inside and around the pit to be repaired. No debris such as mud ice cubes can be left in the pit. Water in the pit does not affect the construction.
2 Brush interface agent
Brush the interface agent when necessary. For example: repair of cement pavement, repair of highway.
3 Fill the pit with cold fill
Fill enough pits into the pit (a 1m³ pit requires about 2.2 tons of cold fill) until the filler is about 1.5㎝ above the road surface. After filling, it’s better that the center of the pit is slightly higher than the surrounding road surface and is curved. If the pit depth is> 4㎝, the repair material should be filled and laminated layer by layer.
4 Compaction
After laying evenly, choose appropriate compaction tools and methods for compaction according to the size and depth of the repaired area and the actual environment. Such as car tire compaction, manual compaction, vibrating plate compaction compaction ad road compactor compaction. When repairing high-grade roads, the periphery and corners of the repaired area should be fully compacted. After the pits are compacted, the joints are closed with emulsified asphalt or joint tapes.
5 Open traffic
It can be opened to traffic immediately after compaction.
ZTA-CA Cold Asphalt Concrete Cold Asphalt for Driveway Asphalt Patch Mix Asphalt Patch in A Bags can be widely used in municipal roads, general roads, highways, parking lots, airport runways, tunnel damage of road asphalt concrete and cement concrete pavement, ruts, municipal road tunneling, repaired pavement, bridge expansion joints, heavy load pavement , repair and maintenance of road traffic and special road.
Approximate repairable area of 1 ton of material:
Repair depth Approximate repairable area
3cm 20㎡
5cm 15㎡
8cm 7.25㎡
10cm 8㎡
Beijing Zhongtian Road-Tech Co.,Ltd. is the Board of Directors of China Transportation Association and Transportation Committee of China Technological Market Association, with expert technical R&D team, continuous innovation ability, rich engineering experience and sufficient capacity. Also we participated in designated road material industry standard certificates.
Contact Person: Shakiya
Tel: 86-15032577974