|
Product Details:
|
Product Name: | Cold Asphalt Premix | Open The Traffic: | Fast Open The Traffic |
---|---|---|---|
Usage Time: | Permanent Repair | Working Temperature:: | -25℃ To 50℃, Can Up To 90℃ For Extremely Hot Places |
Storage: | 2 Years | Application: | Asphalt Pavement |
High Light: | Permanent Repair Cold Asphalt Driveway Repair,3kn Cold Asphalt Driveway Repair,asphalt cold patching |
Permanent Cold Asphalt Driveway Repair Asphalt Patch Material Asphalt Patch Repair all-weather cold paving material is a kind of high-tech road patching material, mixed and prepared by using Zhongtian high-performance cold paving additive, asphalt and aggregate according to certain processing technology, with an appearance of black grain-like solid, slight petroleum smell, insoluble in water, insensitive to motive impact and static electricity, and with stable properties.
Zhongtian potholes repair technology meets the requirements of fast, timely and all-weather. With fast construction speed, easy operation and the advantages of construction in winter and rain and snow.
No. | Performance index | Technical requirements |
1 | Adhesive grade | 5 |
2 | Penetration strength (kg / cm2) | 0.5-4 |
3 | Stability (kN) | ≥3 |
4 | Residual stability (%) | ≥85 |
1. All weather to use
2. Applicable for rainy and snowy
3. Used in concrete or bituminous pavements
4. No need tar coating material
5. Permanent repair, no need to maintenance at least 10 years
6. Construction is simple, open to traffic soon
7. Shelf life unopen 2 years
8. 100% eco-friendly, cold mixing
Zhongtian Permanent Cold Asphalt Driveway Repair Asphalt Patch Material Asphalt Patch Repair is best choice to repair potholes, utility cuts, road edges, water main breaks, also be utilized as permanent asphalt patch, trench reinstatements, man hole adjustments.
1 Pit cleaning
Clean up the gravel residue inside and around the pit to be repaired. No debris such as mud ice cubes can be left in the pit. Water in the pit does not affect the construction.
2 Brush interface agent
Brush the interface agent when necessary. For example: repair of cement pavement, repair of highway.
3 Fill the pit with cold fill
Fill enough pits into the pit (a 1m³ pit requires about 2.2 tons of cold fill) until the filler is about 1.5㎝ above the road surface. After filling, it’s better that the center of the pit is slightly higher than the surrounding road surface and is curved. If the pit depth is> 4㎝, the repair material should be filled and laminated layer by layer.
4 Compaction
After laying evenly, choose appropriate compaction tools and methods for compaction according to the size and depth of the repaired area and the actual environment. Such as car tire compaction, manual compaction, vibrating plate compaction compaction ad road compactor compaction. When repairing high-grade roads, the periphery and corners of the repaired area should be fully compacted. After the pits are compacted, the joints are closed with emulsified asphalt or joint tapes.
5 Open traffic
It can be opened to traffic immediately after compaction.
Zhongtian Permanent Cold Asphalt Driveway Repair Asphalt Patch Material Asphalt Patch Repair can be widely used in municipal roads, general roads, highways, parking lots, airport runways, tunnel damage of road asphalt concrete and cement concrete pavement, ruts, municipal road tunneling, repaired pavement, bridge expansion joints, heavy load pavement , repair and maintenance of road traffic and special road.
Beijing Zhongtian Road-Tech Co.,Ltd. is the Board of Directors of China Transportation Association and Transportation Committee of China Technological Market Association, with expert technical R&D team, continuous innovation ability, rich engineering experience and sufficient capacity. Also we participated in designated road material industry standard certificates.
Contact Person: Shakiya
Tel: 86-15032577974
Fax: 0086-010-6789-3003