|
Product Details:
|
Product Name: | Cold Asphalt 25kg | Open The Traffic: | Fast Open The Traffic |
---|---|---|---|
Usage Time: | Permanent Repair | Storage: | 2 Years |
Application: | All Weather | Temperature: | Both Cold And Hot Temperature |
Use: | Easy To Use, Just Lay It On Potholes | Factory: | Yes, We Are Factory |
High Light: | All weather pothles Cold Mix Asphalt,25kgs Cold Mix Asphalt,cold patching potholes ISO9001 |
ZTA high-performance Cold Asphalt 25kg can be constructed in all weather, without cutting the road surface, and the repair speed is fast. It has strong anti-damage and anti-scattering ability and can be used permanently.
ZTA Cold Weather Asphalt Crack Filler Cold Weather Asphalt Repair Cold Asphalt 25kg Cold Mix Asphalt Paving adopts special cold filling asphalt, which has a strong adhesion to the stone, and it is difficult for water to penetrate into the interface between the stone and the asphalt, and the construction will not be affected in the rainy season. It is the preferred product for the treatment of road pothole diseases in the rainy season.
No. | Performance index | Technical requirements |
1 | Adhesive grade | 5 |
2 | Penetration strength (kg / cm2) | 0.5-4 |
3 | Stability (kN) | ≥3 |
4 | Residual stability (%) | ≥85 |
1. All weather to use
2. Applicable for rainy and snowy
3. Used in concrete or bituminous pavements
4. No need tar coating material
5. Permanent repair, no need to maintenance at least 10 years
6. Construction is simple, open to traffic soon
7. Working temperature is -25℃ to 50℃, can up to 90℃ for extremely hot places.
8. Shelf life unopen 2 years
9. 100% eco-friendly, cold mixing.
1 Pit cleaning
Clean up the gravel residue inside and around the pit to be repaired. No debris such as mud ice cubes can be left in the pit. Water in the pit does not affect the construction.
2 Brush interface agent
Brush the interface agent when necessary. For example: repair of cement pavement, repair of highway.
3 Fill the pit with cold fill
Fill enough pits into the pit (a 1m³ pit requires about 2.2 tons of cold fill) until the filler is about 1.5㎝ above the road surface. After filling, it’s better that the center of the pit is slightly higher than the surrounding road surface and is curved. If the pit depth is> 4㎝, the repair material should be filled and laminated layer by layer.
4 Compaction
After laying evenly, choose appropriate compaction tools and methods for compaction according to the size and depth of the repaired area and the actual environment. Such as car tire compaction, manual compaction, vibrating plate compaction compaction ad road compactor compaction. When repairing high-grade roads, the periphery and corners of the repaired area should be fully compacted. After the pits are compacted, the joints are closed with emulsified asphalt or joint tapes.
5 Open traffic
It can be opened to traffic immediately after compaction.
Cold Weather Asphalt Crack Filler Cold Weather Asphalt Repair Cold Asphalt 25kg Cold Mix Asphalt Paving can be widely used in municipal roads, general roads, highways, parking lots, airport runways, tunnel damage of road asphalt concrete and cement concrete pavement, ruts, municipal road tunneling, repaired pavement, bridge expansion joints, heavy load pavement , repair and maintenance of road traffic and special road.
Approximate repairable area of 1 ton of material:
Repair depth Approximate repairable area
3cm 20㎡
5cm 15㎡
8cm 7.25㎡
10cm 8㎡
Beijing Zhongtian Road-Tech Co.,Ltd. is the Board of Directors of China Transportation Association and Transportation Committee of China Technological Market Association, with expert technical R&D team, continuous innovation ability, rich engineering experience and sufficient capacity. Also we participated in designated road material industry standard certificates.
Contact Person: Shakiya
Tel: 86-15032577974
Fax: 0086-010-6789-3003