Send Message
Home ProductsPavement Preventive Maintenance

Asphalt Pavement Crack Highway Construction And Maintenance And Repair Of Roads

Certification
China Beijing Zhongtian Road Tech Co., Ltd. certification
China Beijing Zhongtian Road Tech Co., Ltd. certification
Customer Reviews
The application of asphalt additives has greatly reduced the cost of producing modified mixtures.

—— Bill- Asphalt Plant Manager

A variety of asphalt additives with different functions make us win more different road works projects!

—— John-Road Contractor

Multifunctional modification equipment enables our company to produce high viscosity modified bitumen in addition to polymer modified bitumen, which is suitable for more projects.

—— Ahmed-PMB Supplier

The full range of road maintenance materials facilitates my purchasing process and meets my purchasing needs in one stop.

—— Sam-Road Maintenance Company

A full range of high-performance road maintenance equipment and a professional technical team make my business bigger and smoother.

—— Matt-Machines Distributor

I'm Online Chat Now

Asphalt Pavement Crack Highway Construction And Maintenance And Repair Of Roads

Asphalt Pavement Crack Highway Construction And Maintenance And Repair Of Roads
Asphalt Pavement Crack Highway Construction And Maintenance And Repair Of Roads Asphalt Pavement Crack Highway Construction And Maintenance And Repair Of Roads Asphalt Pavement Crack Highway Construction And Maintenance And Repair Of Roads Asphalt Pavement Crack Highway Construction And Maintenance And Repair Of Roads

Large Image :  Asphalt Pavement Crack Highway Construction And Maintenance And Repair Of Roads

Product Details:
Place of Origin: China
Brand Name: ZhongTian
Certification: SDS
Model Number: ZTA-VE
Payment & Shipping Terms:
Minimum Order Quantity: 15 tons
Price: USD$3000-5000/ton
Packaging Details: 3kgs or 4kgs per hot-melt bag, 24 kgs per bag. 15 tons per 20 feet container. 27 tons per 40 feet container.
Delivery Time: 5-25 work days
Supply Ability: 4000 tons per year

Asphalt Pavement Crack Highway Construction And Maintenance And Repair Of Roads

Description
Other Name: Stress Absorbing Membrane Interlayer Single Particle Weight: ≤0.015g
Density: 0.85~0.99 G/cm³ Melt Index (135℃,2.16kg): ≥3g/10min
Ash Content: ≤1% Recommended Dosage: 0.3%-0.5% Of Asphalt Mixture
High Light:

Membrane Interlayer highway construction and maintenance

,

0.85g/cm3 highway construction and maintenance

,

maintenance and repair of roads

 

Stress Absorbing Membrane Interlayer to Prevent Reflection Cracks on Asphalt Pavement

prevent reflection cracks on asphalt pavement

 

1. Description

    Reflective cracking is a common disease in asphalt pavement. Reflective cracks destroy the integrity of the road surface and affect the appearance of the road surface. Water enters the base layer through the cracks to accelerate the destruction of the asphalt pavement and seriously affect the performance of the asphalt pavement.
 
    Overlaying the old pavement with new surfacing material is one of the commonly used methods for rehabilitating deteriorated pavements. The existing cracks in the old pavement propagate through the newly laid overlay and reach the free surface in due course of time. This phenomenon is referred to as reflection cracking. In general, using of stress absorbing membrane interlayer (SAMI) is one of the methods to control reflective ceacking.
 
 
 

Asphalt Pavement Crack Highway Construction And Maintenance And Repair Of Roads 0

Reflection cracks
 
    ZTS Stress Absorbing Membrane Interlayer between the cracked structure layer and the asphalt overlay is an effective measure to prevent reflection cracks. It is an asphalt mixture with strong adhesion, impermeability, and good interface bonding performance, can deform with the deformation of the base layer, and has excellent self-healing ability.
 

Advantages of ZTS high elastic anti-crack stress absorption layer:

  • Good adhesion, low temperature resistance and fatigue resistance.
  • Resistance to high temperature deformation.
  • The construction workability of the asphalt mixture is better.
  • Construction is more convenient by using ordinary asphalt paver.
  • No special modified bitumen and special equipment are needed in the production and construction process, the cost is more lower.
  • Environmental protection, no restrictions on asphalt paving.

 

2. Special additive for Stress Absorbing Membrane Interlayer

    ZTA-VE asphalt additive are a new type of composite asphalt additive developed by Beijing Zhongtian Road Tech Co. Ltd. It integrates the technical characteristics of high viscosity, high elasticity, wide temperature range, and warm mixing to improve the crack resistance and fatigue resistance of road materials, reduce the difficulty of road construction, energy saving and environmental protection.
 

Asphalt Pavement Crack Highway Construction And Maintenance And Repair Of Roads 1

 

Table 1 Technical indicators of VE high-elastic anti-cracking additive

ItemUnitTechnical RequirementTest Method
Appearance-Uniform and full particles-
Single particle weightg≤0.015-
Densityg/cm³0.85~0.99GT/T1033
Melt Index(135℃,2.16kg)g/10min≥3GT/T3682
Ash content%≤1T0614
 

 

 

3. Production and Construction of Asphalt Mixture of Stress Absorbing Membrane Interlayer

    When mixing ZTS mixture, firstly add all grades of aggregate and VE high-elasticity anti-cracking additive for dry mixing, then add bitumen and mineral powder, and the mixing time is not less than 45 seconds, of which ZTA-VE additives and aggregate are dry mixed for 10 seconds. The temperature control requirements are shown in Table 2.

Table 2 Temperature control table for mixing and construction

Construction StageTemperature
Bitumen heating temperature140℃~150℃
Mineral heating temperature170℃~200℃
Asphalt mixture delivery temperature150℃~185℃
Asphalt mixture waste temperature>195℃
Paving temperature≥140℃
Initial compacting temperature≥135℃
Repeat compacting temperature≥125℃
Final compacting temperature≥70℃

 

The paving speed of asphalt paver is 3m-6m/min.
The repeat compacting roller needs to be rolled closely with the initial compacting roller.

The initial compacting adopts 13 tons - 15 tons of drum rollers
The repeat compacting adopts 20 tons - 26 tons rubber wheel rollers
The final compacting adopts below 11 tons of drum roller
(The vibration is not turned on during the rolling process)

Traffic can be opened only when the road surface temperature is lower than 50°C

4. Technical comparison of ZTS high elastic anti-crack stress absorption layer & conventional rubber asphalt stress absorption layer

 

ItemZTS high elastic anti-crack stress absorption layerRubber Asphalt Stress Absorbing Layer
Dynamic stability (Times/mm)>1500>500
Low temperature bending micro strain (με)>40002000-4000
Paving temperature (℃)>140>160
Rolling temperature (℃)>135>155
Impact on environmental protectionno effectStrong smell
Ease of useDirectly mixed into the asphalt plant, convenientNeed strict cooperation, strict quality control

 
 

5. Company information

 
    Beijing Zhongtian Road-Tech Co.,Ltd. is the Board of Directors of China Transportation Association and Transportation Committee of China Technological Market Association, with expert technical R&D team, continuous innovation ability, rich engineering experience and sufficient capacity. Also we participated in designated road material industry standard certificates.

 

                     ZTA-RA anti-rutting asphalt additive for heavy load traffic and bus lanes 5

Contact Details
Beijing Zhongtian Road Tech Co., Ltd.

Contact Person: Shakiya

Tel: 86-15032577974

Fax: 0086-010-6789-3003

Send your inquiry directly to us (0 / 3000)